Design Grounding Extension SE Janauba III 500 kV​

Preparation of the grounding system design for the expansion of the Janauba III 500 kV Substation belonging to the «CSF Lagoa Grande 750 MWp» project, which is connected to the National Interconnected System, which is owned by NEOENERGIA, Brazil.

Client: NIP do Brasil.

Owner: NEOENERGIA.

Location: Minas Gerais, Brasil.