Design of the New Earthing System SE Lagoa Grande 500 kV
Preparation of the grounding system design for the new Lagoa Grande 500/34.5 kV Substation, belonging to the «CFS Lagoa Grande 750 MWp» project, which in turn is connected to the National Interconnected System through the SE Janauba III 500 kV owned by NEOENERGIA, Brazil.