Design of the New Earthing System SE Lagoa Grande 500 kV

Preparation of the grounding system design for the new Lagoa Grande 500/34.5 kV Substation, belonging to the «CFS Lagoa Grande 750 MWp» project, which in turn is connected to the National Interconnected System through the SE Janauba III 500 kV owned by NEOENERGIA, Brazil.

Client: NIP do Brasil.

Owner: NEOENERGIA.

Location: Minas Gerais, Brasil.