Projects
Project Description
Sizing study of arresters under ANSI methodology and design of atmospheric protection in SE Veladero 230/34.5 kV.
Sizing study of arresters for 230 and 34.5 kV for power transformer protection, Design and verification of atmospheric protection in the 230 kV switchyard at the existing Veladero 230 kV substation under IEEE Std. 998 2012 standard, design and verification of Atmospheric protection in the new SE Ultracompacta Veladero 230/34.5 kV under NFPA 780 2023 regulations, as part of the “New SE Veladero 230/34.5 kV” project owned by Naturgy.
Client: IGNEO Panamá.
Owner: Naturgy Panamá.
Location: Veladero, Tolé, Chiriqui, Panamá.